22
• Goals
• Background
• Current Process
• Existing Conditions
• Program
• Implementation
• Next Steps
Goals
33
Clearly understand constraints so we
don’t chase unworkable options.1
2
3
Respect the character of Ford Field
and community expectations.
Ensure this study facilitates implementation
and not just another report.
“We understand that the immediate goals
are focused on feasibility, and fundraising,
which will require a report that answers the key
questions without overextending resources.”
Feasibility Study
44
Previous Efforts
• Ford Field Enhancement Master Plan - Dec, 2009
• Town Council Meeting - Oct, 2025
• Joint ASCC and Planning Commission Meeting - Nov, 2025
• Parks and Recreation Committee - Mar, 2026
• Joint ASCC / Planning Commission Meeting - Jun, 2026
Background
55
Feedback Received
Background
• General consensus that restrooms would benefit
the community
• Concession is strongly desired
• Concerns about costs and visual impacts
• Building location needs to be selected
• Consider related site improvements (utilities,
accessibility, and additional amenities)
• Achieve consensus on a plan to move forward
Comments From Initial Meetings
66
Feedback Received
Background
• The building should either be located within the Alpine
Road setback or outside the setback along the edge of the
parking lot, not on the north side of the field
• Accurately locate setback lines to inform potential building
locations
• Building aesthetics should be simple, rustic, and cost-
effective
• Look for ways to reduce project cost
• Develop a project schedule to meet the grant deadline
Joint ASCC / Planning Commission Meeting Comments
“Success in the
end is not more
options…it’s clarity.”
77
Current
Process
Scope
How do we build upon previous efforts?
• Topographic survey
◊ Clarifies site conditions and constraints mapping
• Agency meetings
◊ Confirms connections and process while
identifying potential pitfalls
• Alternatives analysis
◊ Provides a reality check
• Cost estimates
◊ Clarifies implementation costs and aids in funding
• Stakeholder engagement
◊ Clarifies programming and builds support
• Council presentation
◊ Formalizes direction
• Fundraising package
◊ Illustrates vision, generates excitement, helps to
realize funding goals
88
Current
Process
Timeline
MAY JUNE JULY AUGUST
2 0 2 6
Site Constraints Inventory Meeting
Presentation
Joint ASCC/Planning Commission Meeting
Topographic Survey
Preliminary Site Layout Alternatives
Town Council Meeting
SEPTEMBER
WE ARE
HERE
99
Existing
Conditions
Site Photos
1010
View Corridor
Existing
Conditions
1111
18.58.020 - Special setback lines—S
(scenic).
A. Purpose.
Special setback lines—S are established along
streets to assure the provision of space for light, air,
safety, circulation, and visual amenity, and to permit
or require adjustment in the location of structures
to observe unusual physical conditions. Special
setback lines shall be adopted and amended in
conformance with the requirements of Chapter
18.74 and when adopted shall be set forth on the
zoning map.
D.Special Building Setback Lines—S Adopted.
2.Alpine Road
No structure shall be located closer than seventy-
five feet to the right-of-way of Alpine Road in that
section of Alpine Road lying between the northerly
town limits and Portola Road.
*Locating a structure within the setback may
require a General Plan Amendment
*Does not reduce costs significantly
*Sets precedent
18.59.030 - Creek setbacks
A. For building permits and site development
permits, setbacks may be measured from either
the top of creek bank or ordinary high water
mark (see definitions under Sections 18.59.040
and 18.59.050 below) at the option of the
property owner:
3. Parcels of two and one-half acres or more—
Fifty-five feet from top of bank or sixty feet from
ordinary high water mark.
Existing
Conditions
Municipal Code
Site 2
Not Recommended
Within the Scenic
Setback Line
Site 3
Outside of setback
lines. Mitigate
impact of parking
loss and home run
balls.
Site 1
Not feasible due
to increased costs
(infrastructure
and access) and
impact to open
space.
1212
Existing Field
Sewer Manhole, Typ.
Existing Drinking Fountain
Existing Electrical Meter
Utility Pole, Power Drop
Approximate Location
Of Sewer Main
Existing Tree, Typ.
75’ Alpine Road Scenic Setback Line
ALPINE ROAD
Top of Bank
55’ Setback Line
Existing
Conditions
Setbacks & Utilities