Portola ValleyRecords

← All records

09-16-2026 Trails & Paths Agenda Packet

Town websiteAgenda20264 pages

Trails and Paths Committee · 2026-09-16

Open official copy →
Gary Hanning, Chair, Patricia Murray, Vice Chair TOWN OF PORTOLA VALLEY Joe Coleman, Secretary Barb Eckstein, Member Trails and Paths Committee Meeting Ellie Ferrari, Member September 16, 2026 Susan Gold, Member Jeff Lokey, Member 9:00 am Brenda Munks, Member Fred Leach, Member AGENDA REGULAR MEETING HISTORIC SCHOOLHOUSE– 765 PORTOLA RD. – PORTOLA VALLEY, CA REMOTE MEETING ADVISORY: On March 1, 2023, all committees in Portola Valley will return to conducting in- person meetings. A Zoom link will be provided for members of the public to participate remotely; however, the Town cannot guarantee there will be no technical issues with the software during the meeting. For best public participation results, attending the meeting in-person is advised. ASSISTANCE FOR PEOPLE WITH DISABILITIES In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Town Clerk at (650) 851-1700 or by email at towncenter@portolavalley.net. Notification 48 hours prior to the meeting will enable the Town to make reasonable arrangements to ensure accessibility to this meeting. VIRTUAL PARTICIPATION VIA ZOOM To access the meeting by computer: https://us06web.zoom.us/j/81466512315?pwd=QMIHyGVyZ7fH0z2uix45bZ4SwiXfYQ.1 Webinar ID: 814 6651 2315 Passcode: 555592 To access the meeting by phone: 1-669-900-6833 or 1-888-788-0099 (toll-free) Mute/Unmute – Press *6 / Raise Hand – Press *9 1. CALL TO ORDER & ROLL CALL 2. ORAL COMMUNICATIONS FOR ITEMS NOT ON THE AGENDA Speakers' time is limited to two minutes. 3. OLD BUSINESS: a. Approve Minutes from August Meeting b. Trails Maintenance Update c. Portola Terrace Update d. Site Development Permits e. Easements f. Hawthorns Project g. Eagle Trail/Trail Center Project h. Trails and Paths Ordinances, Resolutions and Guidelines Study 4. NEW BUSINESS a. Palmer Trail 5. OTHER BUSINESS 6. ADJOURNMENT The next regularly scheduled meeting date is October 21st, 2026. ************************************************************************************************************************ Land Acknowledgement: The Town of Portola Valley acknowledges the colonial history of this land we dwell upon—the unceded territory of the Ramaytush (rah-my-toosh) Ohlone, Tamien Nation, and Muwekma (mah-WEK-mah) Ohlone, who endured a human and cultural genocide that included removal from their lands and their sacred relationship to the land. Portola Valley recognizes that we profit from the commodification of land seized from indigenous peoples and now bear the ecological consequences. We seek to understand the impact of these legacies on all beings and to find ways to make repair. Trails and Paths Committee Meeting Minutes DRAFT August 19, 2026 TOWN OF PORTOLA VALLEY Trails and Paths Committee Meeting August 19, 2026 9:00 AM TRAILS AND PATHS COMMITTEE MEETING MINUTES - DRAFT 1. Call to Order & Roll Call: The meeting was called to order at 9:01 am. Members present: J Coleman, E Ferrari, G. Hanning, J Lokey, B. Eckstein, P. Murray, F Leach Member absent: S Gold, B Monks Also present: D Smith (Town Manager), T Coleman (Conservation Committee liaison). 2. Oral Communications: T Coleman spoke as a resident, requesting all to consider cutting the weed, Dittrichia as it is invasive and needs to be eliminated from trails. D Smith instructed all that when they want to report a code violation, please send to CODE@PortolaValley.net and include details with photos. 3. Old Business: a. Approval of Minutes for May 20, 2026: Approved as corrected. b. Trail Maintenance Update: Report issues through the Town website and T McFarlan will address them. c. Portola Terrace Update: A map is in process with our inputs being considered. d. Site Development Permits: None e. Easements: G Hanning said there is attention being made to an easement on Alpine Road. f. Hawthorns Project: There will be a study session at 5:30 PM. On 8/26/26 at the Old School House. Safety and other issues will be discussed. g. Eagle Trail/Center Project: In the works. h. T & P Ordinances, Resolutions and Guidelines Study: Town is considering issuing Administrative Citations as a form of enforcement of trail use rules. 4. New Business: Town Picnic will be September 19. Need helpers for our table. 5. Other Business: None 6. Adjournment: The meeting was adjourned at 10:02 AM. Next meeting will be September 19, 2026. 1 MEMORANDUM TOWN OF PORTOLA VALLEY ________________________________________________________ TO: Trails and Paths Committee FROM: Scott Weber, Maintenance Worker III Tony McFarlane, Assistant Town Manager DATE: September 9th, 2026 RE: Trail work for August 2026 Attached is the trail work recording form completed for August. The total maintenance staff hours worked in August was 10 hours. The total contracted staff hours worked August was 0 hours. Total hours worked: 10 hours Attachments: Trail Map Work sheet C:\Users\vdao\Downloads\August 26 trails memo.doc Trail Length Work Completed Date Admiral Quilter 0.5 Alpine 3.0 Cut brush from ranch gate to Portola 8-17 Arroyo 1.6 Bay Laurel 0.5 Black Oak 0.8 Blue Oak 0.5 Buckmeadow 0.5 Cervantes 1.3 Cherokee 0.2 Coalmine 0.8 Deer Path 0.7 Dwight Crowder 2.0 Trimmed up low trees along Creek Park 8-27 Eagle 0.6 Fawn 0.3 Fire Road 0.5 Firethorne 0.1 Georgia 0.3 Golden Hills 0.7 Golden Oak 0.2 Grove 0.6 Hay Forks 0.7 Cleared hazardous tree 8-18 Hillbrook 0.4 Indian Crossing 0.4 Iroquois 0.2 Lake 0.4 Larry Lane 1.5 Los Trancos 1.1 Los Trancos Rd 0.4 Meadowwood 0.4 Minoca 0.7 Nathorst 0.3 Old Spanish 1.9 Removed hanging branch 8-17 Palmer 0.6 Portola 2.3 Possum 0.2 Priory 0.5 Redberry 0.2 Sausal 0.6 Sequoia 0.5 Shady 0.8 Shawnee 0.5 Sunrise 0.8 Sweet Springs 0.8 Toyon 2.4 Cleared fallen tree 8-6 Veronica 0.2 Westridge Willowbrook 0.8 36.0 TOTAL miles C:\Users\vdao\Downloads\August 26 trails memo.doc