← All records

11-16-2026 Council Docs

Town websiteAgenda202667 pages

Town Council - Special Meeting · 2026-11-18

Open official copy →Meeting recording
11/17/2026 Claude summary of the CPUC Rate document that is linked on pg. 20 of this PDF (from Nov. 19, 2026 Public Utilities Commission of the State of California Agenda Packet) Application 26 -02-005 DECISION ADOPTING A DDITIONAL RULES FOR THE SENATE BILL 884 EXPEDITED UTILITY D ISTRIBUTION INFRASTRUCTURE UNDERGROUNDING PROGRAM The de cision in plain terms The s ituation: A 2 024 state law lets the three big electric utilities (PG&E, Southern California Edison, San Diego Gas & Electric) get a fast-track review of 10-year plans to bury power lines in high fire-risk areas. The state utilities commission has to decide how to judge whether a given burial project is worth the money, how to check the utilities' spending afterward, and what happens if a project costs more than promised. This decision sets those rules. What t he rules s ay: 1. J udging whether a project is worth it. Every utility must use the same math to compare a project's benefits (fewer fires, fewer outages, lower maintenance) against its costs. Maintenance savings count as a benefit, extra maintenance costs count as a cost, and the same discount rate applies to everything. Outage value is based on the customers actually in the affected areas, not the whole system. 2. Checking the spending afterward. An independent auditor reviews each individual. project. The utilities wanted a statistical sample of the whole portfolio. The commission said no and also denied their request for a 2% cushion on the annual spending limit. 3. Five new conditions for recovering costs from customers. A project's costs can't be recovered if: o it was not at least as cost-effective as the best alternative, such as covered wires or tree trimming; o its actual cost is more than 30% above the forecast; o its actual benefit-to-cost ratio is more than 30% below the forecast; or o its forecast ratio falls below 1, meaning costs exceed benefits. 4. No "local factors" exception. Utilities can't pick burial over a better alternative just because of reasons outside the risk models. Who benefits The rules mostly favor the parties who pushed for tighter oversight: • Electricity customers generally. Customers pay for this program through their bills, and the new conditions give the commission a way to refuse or refund costs for projects that overrun or weren't the best choice. The decision says that without these conditions, nothing would protect customers when burial is chosen over a cheaper, equally effective option. • The groups that argued for these rules: the state's consumer advocate office, the consumer group TURN, large industrial energy users, and telephone/cable providers. Their positions on project-level audits and conditions are largely what the decision adopted. The communications companies argued the utilities shouldn't impose costs on third parties without showing each project is worth it. • Communities in high fire -risk areas, indirectly. If the rules work, money goes to the projects that reduce the most risk per dollar rather than whichever projects a utility prefers. The utilities lose flexibility. They argued for managing the program as a whole portfolio, where a bad project can be offset by good ones, and for oversight at that level only. The decision rejects that for the cost-recovery conditions. On PG&E's opposition I can't confirm PG&E's current stance from this document. The three utilities filed jointly and argued together, so the opposition appears as the "Joint" position rather than PG&E alone. The document shows them opposing project-level conditions, project-level audits and the other points above. It doesn't include their reaction to this proposed decision, since comments on it are filed afterward and aren't part of the text. Their objections will likely show up in those comments, or in a revised decision if the commission changes it before voting. One correction to my last answer: I said PG&E's general rate case is where its undergrounding costs are "currently being addressed. " The document only lists that case in a footnote, in the context of keeping previously funded work out of this program. I shouldn't have said more than that. Detailed Summary of the 160 page cocument I'm skimming this 160-page proposed decision on SB 884 undergrounding, and next I'm pulling the key rulings from each section and the order. Now the Conclusions of Law, which hold the actual rulings. Summary: Proposed Decision on SB 884 Undergrounding Rules (A.26 -02-005) What it is: A 160-page proposed decision by Commissioner John Reynolds, mailed October 16, 2026. It has no legal effect unless the CPUC votes to approve it, and it could be heard as early as the November 19, 2026 Business Meeting. It resolves the joint application of PG&E, SCE and SDG&E, filed in February 2026 as directed by Resolution SPD-37. It closes the proceeding. Background: SB 884 created an optional, expedited pathway for the three large utilities to get review of 10-year plans to move overhead distribution lines underground in Tier 2 and 3 High Fire-Threat Districts and wildfire rebuild areas. In Phase 1, Energy Safety approves the plan. In Phase 2, the CPUC conditionally approves costs, and approved costs are recorded to a one-way balancing account with no after-the-fact reasonableness review. In Phase 3 the utility builds the plan and the costs are audited. This decision sets the rules for how benefits are calculated, how the audit works, and what additional conditions apply. 1. Benefit -Cost Ratio (BCR) methodology The decision standardizes the BCR calculation across all three utilities: • O&M: O&M savings go in the numerator as a benefit, and incremental O&M costs go in the denominator. Utilities must report each separately. • Risk scaling: Unscaled, risk-neutral values are used until the CPUC adopts something else in the new RDF proceeding (R.26-04-016). • Reliability value (ICE Calculator): Version 2.0 is used for now, with separate values for HFTD and non-HFTD areas and for residential and non-residential customers. The values are based on the eligible-area customer population, not the system-wide population the utilities proposed. • Discount rate: A single rate, the utility's WACC, applies to everything. • Backcasting: Forecast BCRs and unit costs are recalculated at the risk reporting unit (RRU) level so forecast and actual values compare like with like. • Other definitions: Net salvage value is included in costs, and present value revenue requirement (PVRR) is used. "Year Zero" is the year a project becomes used and useful. Everything is measured against a "No-Build Baseline" of the existing system with already-funded mitigations. 2. Audit framework • The audit is done at the project/RRU level. The utilities' proposal for portfolio-level statistical sampling is rejected. • There is a single audit report, filed in the utility's plan proceeding. It must follow Generally Accepted Government Auditing Standards (GAGAS), and the benefits side of the BCR is audited too. • Cost cap, third-party funding offsets, average unit cost, and average BCR are each verified under defined methods. The utilities' request for 2% variance thresholds on the annual cost cap is denied. • Incrementality is checked by comparing GRC-authorized undergrounding mileage (not just dollars) against the mileage proposed in the plan. 3. Five new Phase 2 Conditions (#6 –#10) • #6: Costs must be tied to projects whose forecast BCR was at least that of the best alternative mitigation. • #7: Re-evaluate the best alternative if a project's Screen 4 BCR drops below it. • #8: A project's actual BCR can't be more than 30% below its Screen 4 forecast. • #9: A project's actual unit cost can't be more than 30% above its Screen 4 forecast. • #10: A project's Screen 4 BCR must stay at or above 1. The 30% threshold is set slightly tighter than the upper bound of the AACE Class 4 estimate range (-30% to +50%). 4. Other rulings • The utilities' request to weigh "local factors" outside the risk models when an undergrounding BCR is within 70% of an alternative's is rejected . • Previously scoped or funded projects can be recorded to the plan's balancing account only if they are incremental to costs authorized in a GRC or other proceeding. Any previously authorized scope must be reflected in the No-Build Baseline. Ordering paragraphs 1. The utilities must follow SPD-15, SPD-37 and the associated guidelines, as revised here, when filing their 10-year plans. 2. Within 45 days of the decision's effective date, each utility must file a Tier 2 Advice Letter listing qualified auditors and showing how they meet the audit standards. 3. The proceeding is closed. I read the summary, background, conclusions of law and order closely, and skimmed the discussion sections. I can go deeper on a particular section, such as the parties' positions on discount rate or risk scaling. Cost to consumers? This decision doesn't state a cost to consumers. It contains no bill impacts, no rate increases, and no total program cost. The only dollar figure in the whole document is an unrelated reference to a PG&E catastrophe bond. That's because it sets rules , not dollar amounts. The cost numbers come later, in each utility's Phase 2 Application, when the CPUC decides whether to conditionally approve a 10-year plan's costs. At that point it sets the actual annual cost cap, the average unit cost limit, and the minimum average BCR. None of those exist yet, and the decision says they will be fixed in the Phase 2 decision. What the decision does say about consumer exposure: • Ratepayers pay. Costs recorded to the program's one-way balancing account are recovered through rates, and the account is not subject to after-the-fact reasonableness review. The decision relies on the Phase 2 Conditions and the audit as the protection instead. • New limits on overruns. The five new conditions block recovery for projects that are less cost-effective than alternatives, have actual unit costs more than 30% above their Screen 4 forecast, or have actual BCRs more than 30% below it. • Refunds are possible. If an audit finds costs were recorded incorrectly or failed the conditions, the CPUC may order a refund. The details, such as frequency, true-up and refund mechanism, are left to the Phase 2 proceeding. • Third -party funding offsets the cap. Any such funding received reduces the annual cost cap for that year. • Costs already approved elsewhere can't be double -counted. Previously scoped or funded undergrounding can only be recorded if it is incremental to what was authorized in a general rate case. To see actual dollar exposure, look at the utilities' 10-year plans at Energy Safety, and at their Phase 2 Applications once filed. PG&E's pending general rate case (A.25-05-009) is also where its undergrounding costs are currently being addressed for rates. Matters of Public Interest For the convenience of the public and media representatives, items of widespread public interest will be taken up at the beginning of the meeting. For further information contact the Public Advisor (415) 703-2074 E-mail: public.advisor@cpuc.ca.gov This location is accessible to people with disabilities. If specialized accommodations for the disabled are needed, e.g. sign language interpreters, please call the Public Advisor at (415) 703-2074 or TTY # (415) 703-5282 or toll free # 1- 866-836-7825 three business days in advance of the meeting. Public Utilities Commission of the State of California Public Agenda 3590 Thursday, November 19, 2026, 11:00 a.m. 801 Capitol Mall Sacramento, California Commissioners John Reynolds, President Matthew Baker Karen Douglas Christine Harada Darcie L. Houck For each agenda item, a summary of the proposed action is included; the Commission's decision may, however, differ from that p