11-16-2026 Council Questions
Town Council Me e ting
November 18, 2026
Responses to Council Agenda Packet Questi ons
Agenda Item 8e
1. What is the existing unused fiber connection? Is that not available for use?
(finding #4)
As part of the work following the Schoolhouse cabling project, Eaton &
Associates (E&A) will ask the vendor, Sabro to inspect the existing fiber
connection between the downstairs main network room (MDF) and the second-
floor network room (IDF). These two areas are currently connected by copper
cabling, and there is also an existing fiber connection that is not currently in use.
The fiber cable is presently disconnected and hanging at the wall outlet. The
previous IT vendor was unable to provide details.
The purpose of the inspection is to determine whether the existing fiber
connection is operational and can be activated. If it is usable, it could provide
connection speeds of up to 10 Gbps, compared to the current 2.5 Gbps capability
of the copper connection.
2. There is no mention in the quote for “Recommendation #4: Install two (2) single-
mode transceivers to activate the existing fiber connection between the Town
Hall main network room and the server room, allowing for higher network
speeds.” Are the 2 transceivers included in the job?
The transceivers are not included in Sabro's cabling quote. E&A has requested
that the Town purchase three (3) two-packs of UniFi SFP modules, for a total of
six (6) modules. Each two-pack costs $38, bringing the total purchase cost to
$114. These can be purchased directly from UniFi.
Four modules will be used for the immediate Schoolhouse cabling project. The
remaining two will be available if the separate fiber connection referenced in
Question 1 is confirmed to be operational and suitable for use.
3. Will the presenter’s table and TV also be outfitted with ethernet connections?
Yes. Sabro will install 12 wired Ethernet connections at the Council Chambers
table: 10 for individual seating positions, one for the Zoom Room controller, and
one additional connection.
This will eliminate the need for the unmanaged network switch currently located
underneath the table and provide more reliable, direct network connections for
Town-owned devices.
The wired Ethernet connections will allow for the installation of dedicated Town-
owned desktop computers available at the Council dais for use during meetings if
approved in the future.
4. Will Wi-Fi still be available at the dais for iPads, laptops without ethernet ports?
Yes. Guest Wi-Fi will remain available throughout the schoolhouse for non-Town
owned devices to use. Council members, as well as committee or commission
members, and the public will continue to be able to connect to personal iPads,
laptops, and other wireless devices without requiring a wired connection.
5. Will USB cables be provided so members can connect to their pc/s if they don’t
have ethernet ports?
The Town currently does not support the connection of any personal devices
directly to the Town's wired network. For security purposes, all personal devices
must use the Town's Guest Wi-Fi network. This provides wireless connectivity
without requiring a direct connection to the Town's internal network.
6. What is the anticipated network speed after the work is completed?
The connection between the Schoolhouse and the main building is currently
operating at approximately 100 Mbps. Following completion of the project, the
connection is expected to support speeds of up to 10 Gbps (10,000 Mbps).
This represents a significant improvement in connection capacity and should
provide substantially better performance.
7. Is this project done with prevailing wages or is the project too small to require
that?
The Town is required to pay prevailing wages on all public works projects over
$1,000. This project is exempt from the Department of Industrial Relations
certified payroll reporting requirement as the total cost is less than the $25,000
threshold and is considered a small project.
8. Is there no need for competitive bidding?
Not for this project. Under CUPCAA, Public Contract Code Section 22032, any
public works project on a town facility under $75,000 can be done with no
bidding. The Town's practice is to review these projects on a case-by-case basis
and given the nature of the problem(s) with the Schoolhouse, it is prudent to
complete this project as soon as possible. Additionally, the Town completed a
RFP process to procure Eaton & Associates, who facilitated obtaining this scope
from a vendor (Sabro) that they are experienced with.
9. Will there be a trench dug through the Town center?
No. The project is expected to use existing pathways and infrastructure. No new
trenching through the Town Center is anticipated.
10. When would the work be scheduled to be completed?
Once the project begins, Sabro estimates that the cabling work will take
approximately three to four days to complete.
During this period, the Schoolhouse will temporarily be without network
connectivity. Once Sabro completes the cabling work, E&A will reconnect the
network and verify connectivity.
The Town's Public Works team will also need to coordinate access to the existing
underground communication access points (manholes). These locations will
need to remain accessible during the project, and Facilities will place cones at
the designated locations on the selected work dates to prevent vehicles from
blocking access.
The specific work dates will be coordinated in advance to minimize disruption.
11. The date on the quote is Oct 15, signed Oct 21. Is it still valid for 30 days?
Sabro has confirmed that the quote will remain valid through November 30, 2026.
12. With the completion of this project, will the Town no longer need the $100K
upgrade that was mentioned in the past?
No, once the cabling is in place, if there are other issues that need to be
addressed, equipment-wise, then we will bring that back to Council for review.
13. The budget on the PV budget website (undated) for 2026-27 shows Capital
projects fund expenditures of $224,737 with an ending balance of $446,447.
What does it mean in the memo that the fiscal impact will “increase the Capital
Projects Fund to $218,366 for Fund 401” and where does the $408,743
unappropriated cash balance number in the Capital Project Fund mentioned in
the memo come from? What is the latest budget status?
It appears that the Valley Oak Trail Bridges project ($22,371) was not included in
the CIP Schedule. This amount is a carryover from FY 25-26. The FY26-27
Budget - Section III: Capital Projects: Department 700 budget page shows a total
CIP budget of $1.45 million, with a Fund 401 budget of $202,366. The $408,743
is the amount of cash available in Fund 401 that has not been appropriated in the
budget. In other words, there is a sufficient amount of cash available in the Fund
to pay for this project. Cash and Fund Balance are mutually exclusive in fund
accounting.